Sign In | Join Free | My burrillandco.com
Home > Overhead Conveyor Coating Line >

Automatic Pre-Brazing Surface Preparation Line

CoatTech Intelligent Equipment(Guangzhou) CO.,LTD
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Automatic Pre-Brazing Surface Preparation Line from wholesalers
     
    Buy cheap Automatic Pre-Brazing Surface Preparation Line from wholesalers
    • Buy cheap Automatic Pre-Brazing Surface Preparation Line from wholesalers

    Automatic Pre-Brazing Surface Preparation Line

    Ask Lasest Price
    Payment Terms : T/T
    Model Number : OCCL-OCT3
    Delivery Time : 15 DAYS After Deposit
    Price : USD2000-USD10000/SET
    Supply Ability : 500SET/MONTH
    Certification : CE
    Brand Name : CoatTech
    • Product Details
    • Company Profile

    Automatic Pre-Brazing Surface Preparation Line

    Automatic Pre-Brazing Surface Preparation Line

    For Towel Radiators & Steel Tube Assemblies

    Automatic Pre-Brazing Surface Preparation Line

    Towel radiator, model 1200 × 500 mm — the product processed on this line

    1. Product Overview

    This is a complete automatic surface preparation line for steel towel radiators, installed upstream of the brazing furnace. It removes oil, rust and mill scale from the steel elements — collectors and tubes — before brazing paste is applied and the radiator is brazed.

    Unlike a powder coating line, this system performs no painting. Its purpose is to deliver a chemically clean, fully dried, chloride-free surface so that the brazing filler metal wets the base metal completely and the joint is free of porosity.

    Key design decision — elements are treated before assembly

    The line processes the individual elements (2 semi-oval collectors + 26 round tubes per radiator) rather than the assembled radiator. This brings three advantages:

    · Far shorter line — the tunnel cross-section is set by an element, not by a 1200 mm assembly;

    · Higher cleaning efficiency — solutions reach every surface, including the inside of hollow profiles;

    · Flexible dwell times — tubes (light rust) and collectors (moderate to heavy rust) can be given different treatment times in the same line.

    Typical line configuration

    Automatic hoist basket immersion line. Elements are loaded flat into baskets, and a programmable overhead hoist transfers each basket through the tank sequence, giving each basket its own dwell time in every stage.

    2. Technical Specifications

    Figures below are for the reference project (100 radiators/hour). Every value is engineered to order.

    Parameter

    Specification

    Product

    Towel radiator, model 1200 × 500 mm (other sizes on request)

    Workpiece

    Steel elements: semi-oval collectors 40 × 30 mm, round tubes Ø25 mm

    Material

    S235JR steel, 2.0 mm wall thickness

    Max. element length

    1,800 mm

    Elements per radiator

    2 collectors + 26 tubes = 28 pieces (+ 4 end caps)

    Weight per radiator

    19.6 kg

    Capacity

    100 radiators/hour = 200 collectors + 2,600 tubes = 2,800 elements/hour

    Steel throughput

    Approx. 1.96 t/hour

    Line type

    Automatic hoist basket immersion line

    Tank internal size

    Approx. 2,200 × 1,100 × 800 mm (approx. 1.6 m³ of solution)

    Basket capacity

    10 radiators per basket (280 elements, approx. 196 kg)

    Heating source

    Electric or natural gas (both options available)

    Installed power

    Approx. 200 kW (all-electric) / approx. 105 kW + 12 m³/h natural gas

    Voltage

    Designed for 400 V / 50 Hz three-phase (other standards on request)

    Control

    PLC + touchscreen HMI, automatic hoist sequencing, recipe storage

    Tank material

    PP / FRP for acid stages; stainless steel for alkaline stages

    Heat exchanger

    PTFE or graphite for hydrochloric acid; stainless steel for phosphoric acid

    Exhaust

    Acid mist extraction with scrubber

    Effluent

    Neutralisation station (supplied or prepared by customer)

    3. Process Sequence

    Automatic Pre-Brazing Surface Preparation Line

    Process flow: degreasing → rinsing → pickling → rinsing → neutralising → DI rinsing → drying → brazing

    #

    Stage

    Method

    Temperature

    Dwell time

    Purpose

    1

    Degreasing

    Immersion

    40–60 °C

    3–5 min

    Removes drawing oil, grease and shop soil

    2

    Rinse 1

    Immersion

    Ambient

    1 min

    Removes alkaline residue before the acid stage

    3

    Pickling

    Immersion

    25–40 °C

    3–8 min

    Dissolves rust and mill scale; dwell set per element type

    4

    Rinse 2

    Immersion, counter-flow

    Ambient

    1 min

    Removes acid residue

    5

    Neutralising

    Immersion

    40 °C

    1–2 min

    Mild alkaline rinse; removes chloride residue, prevents flash rust

    6

    DI final rinse

    Immersion

    Ambient

    1 min

    Deionised water; conductivity monitored online

    7

    Drip + air knife

    Blower

    Ambient

    2–3 min

    Removes bulk water; cuts drying energy by approx. 30%

    8

    Drying

    Hot-air oven

    100–130 °C

    10–15 min

    Complete drying — no water may enter the brazing furnace

    After the line: brazing paste is applied immediately, then the assembly enters the brazing furnace.

    3.1 Why each step matters for brazing quality

    · Oil left on the surface blocks wetting of the filler metal — degreasing is not optional;

    · Chloride residue from hydrochloric pickling must be fully removed, or the joint will be defective;

    · Water trapped inside the tubes or collectors turns to steam inside the brazing furnace and causes porosity — which is why drip zones and complete drying are designed in, not added as an afterthought;

    · Bare steel can flash-rust within hours, so drying must be complete and paste applied right after the line.

    4. Element Handling

    Automatic Pre-Brazing Surface Preparation Line

    Automatic Pre-Brazing Surface Preparation Line


    Element breakdown | Basket with tilt

    Element breakdown (model 1200 × 500)

    Element

    Specification

    Qty per radiator

    Unit weight

    Collector

    Semi-oval 40 × 30 mm, length 1,200 mm (up to 1,800 mm)

    2

    2.25 kg

    Tube

    Round Ø25 mm, length 470 mm, arranged 5 / 9 / 12

    26

    0.58 kg

    End cap

    Ø10 × 24 mm

    4

    —

    Total

    S235JR steel, 2.0 mm

    28 + 4

    19.6 kg

    Basket and rack design

    · Elements are laid flat in baskets, not hung vertically. At 1,800 mm a vertical tank would need to be about 2.4 m deep; a flat basket needs only about 0.8 m.

    · Baskets hold the elements at an angle of roughly 10–15° so that solution enters and drains completely from the hollow profiles.

    · Oscillation and tank circulation can be added to renew solution inside the collectors — this is what actually removes rust from the inside, not longer immersion time.

    · Different baskets can be assigned different dwell times by the hoist programme, so tubes and collectors are each treated exactly as long as they need.

    5. Line Layout

    Automatic Pre-Brazing Surface Preparation Line

    Automatic hoist basket immersion line — tank sequence with overhead hoist and final drying oven

    Layout principles applied

    · One-way material flow — load at one end, unload at the other, no backtracking;

    · Isolation zones between chemical stages prevent cross-contamination: alkaline carried into the acid tank neutralises it, acid carried into a rinse tank causes flash rust;

    · Counter-flow rinsing — fresh water enters at the final rinse and overflows backwards, cutting water consumption to approximately 0.8–1.5 m³/h;

    · Straight, U-shaped or L-shaped layouts available to suit the available floor area;

    · Maintenance access, FRP walkways and inspection doors designed into every tank.

    Utilities required (reference project)

    Utility

    Requirement

    Electrical power

    Approx. 200 kW installed (all-electric) or approx. 105 kW with gas-fired dryer

    Natural gas

    Approx. 12 m³/h (gas-fired drying oven option)

    Water make-up

    0.8–1.5 m³/h, counter-flow rinsing

    Deionised water

    Approx. 0.3 m³/h for the final rinse

    Compressed air

    6–8 bar, instrumentation only (air knife uses a blower, not compressed air)

    Exhaust

    Acid mist extraction to scrubber

    Effluent

    Neutralisation of spent pickling liquor and rinse water

    Clear height

    Approx. 4.5 m minimum for the hoist line

    6. Result

    Automatic Pre-Brazing Surface Preparation Line

    Steel elements before and after the pre-brazing treatment — rust removed, bright metal exposed

    Aspect

    Result

    Surface condition

    Free of oil, rust, mill scale and chloride residue

    Internal cavities

    Reached and drained by design — basket tilt plus optional circulation

    Drying

    Complete; no trapped water entering the brazing furnace

    Final rinse control

    Online conductivity monitoring with alarm limit

    Flexibility

    Separate dwell times for tubes and collectors; adjustable to the incoming rust level

    Chemistry

    Runs on the customer's locally supplied chemicals, or equivalent CoatTech chemistry

    7. Project Reference

    Item

    Detail

    Client

    A leading steel tube and section manufacturer in Algeria

    Industry

    Steel tube production, towel radiator manufacturing

    Location

    Boudouaou, Algeria

    Application

    Surface preparation of collectors and tubes before brazing

    Capacity

    100 radiators per hour

    Scope

    Process design, equipment supply, layout, commissioning support

    Status

    Engineering proposal stage

    Note for publication: confirm with the client before publishing their company name. If approval is not obtained, use the wording above.

    7.1 What the client asked for

    · Treatment of elements before assembly, to shorten the line and increase cleaning efficiency;

    · Different dwell times for lightly rusted tubes and heavily rusted collectors;

    · Racks or baskets that let solution reach and drain from the inside of hollow profiles;

    · Conductivity monitoring of the final rinse with a defined limit, before brazing paste is applied;

    · The immersion option kept in the offer for the pickling stage.

    8. Why CoatTech

    Advantage

    Description

    Process first, equipment second

    We size the line from the chemistry and the rust level, not from a catalogue

    Corrosion-resistant construction

    PP / FRP tanks and PTFE or graphite heat exchangers for hydrochloric acid; SUS304 / SUS316 for alkaline and phosphoric stages

    Complete drying design

    Air knife blow-off before the dryer, cutting drying energy by roughly 30%

    Traceable rinse quality

    Counter-flow rinsing with online conductivity monitoring on the final rinse

    Flexible line control

    Hoist-programmed dwell times per basket — different recipes for different elements or rust levels

    Local chemistry compatible

    Designed to run on chemicals already available in the customer's market

    Energy options

    Electric or natural gas heating, quoted side by side so you can compare operating cost

    Export experience

    Projects delivered across Africa, the Middle East, Europe and Asia; CE documentation and French-language technical files available

    Payment terms

    Irrevocable letters of credit accepted for African projects

    9. Applications

    The same line concept is used for any steel assembly that is brazed, welded or coated and needs a chemically clean surface beforehand:

    · Towel radiators and heating radiators — collectors, tubes and headers before brazing;

    · Steel tube assemblies — furniture frames, heat exchangers, condenser coils;

    · Automotive and HVAC components — tube-and-header assemblies before brazing;

    · General steel fabrications — as the pretreatment stage ahead of powder coating or liquid painting.

    10. Frequently Asked Questions

    Q: Is this a powder coating line?

    No. It is a pre-brazing surface preparation line. It cleans and dries the steel elements; no powder or paint is applied. If you also need a powder coating line after brazing, we design and supply that as a separate line.

    Q: Spray tunnel or immersion tanks — which do you recommend?

    For this application we recommend immersion. Heavy rust on the collectors needs minutes of contact, and the inside of the hollow profiles must be wetted — spray cannot do either reliably. We can quote a spray version for comparison.

    Q: Does immersion mean electrolytic immersion?

    No. We mean simple chemical dipping with no electric current. Electrolytic immersion needs a rectifier and electrodes, costs significantly more, and we do not recommend it as the base design.

    Q: Can tubes and collectors have different treatment times?

    Yes. That is a standard feature of a hoist line — the programme assigns a dwell time to each basket, so tubes and collectors are each treated exactly as long as they need.

    Q: How do you stop rust remaining inside the collectors?

    Baskets hold the elements at an angle so solution enters and drains, and we offer tank circulation and basket oscillation to renew the solution inside the profile. Longer immersion alone does not solve it.

    Q: Which acid should we use — hydrochloric or phosphoric?

    Both work. With hydrochloric acid the tanks must be PP or FRP and the heat exchangers PTFE or graphite — stainless steel cannot be used. Phosphoric acid allows stainless steel tanks and leaves a light anti-rust film. We will quote to your preference.

    Q: What utilities does the line need?

    For the reference project: approximately 200 kW installed power (or about 105 kW with a gas-fired dryer plus roughly 12 m³/h of natural gas), 0.8–1.5 m³/h of water make-up, deionised water for the final rinse, 6–8 bar compressed air for instrumentation, and acid mist extraction with a scrubber.

    Q: Can the line run on chemicals we already buy locally?

    Yes. We design the line around your existing products and parameters. We can also supply equivalent chemistry if you prefer.

    Q: Do you supply the fume scrubber and effluent neutralisation?

    Both are available. We will supply them if required, or design the connection points and let your local contractor build them — whichever you prefer.

    Q: What is the delivery time?

    Typically 8–14 weeks from order to delivery, depending on the configuration, plus installation and commissioning. We will state a firm schedule with the quotation.

    Q: Do you provide installation and training?

    Yes. We provide installation supervision, commissioning and operator training, and we can quote either as a separate item or included in the package.


    Automatic Pre-Brazing Surface Preparation Line

    Automatic Pre-Brazing Surface Preparation Line

    Quality Automatic Pre-Brazing Surface Preparation Line for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: CoatTech Intelligent Equipment(Guangzhou) CO.,LTD
    *Subject:
    *Message:
    Characters Remaining: (0/3000)
     
    Find Similar Products By Category: